Climatological variables to your sky temperatures, dampness, cinch, rain and evaporation in the Khachmaz area, and you may dos. Inflows to help you Deveci river and its particular liquid profile step 3. In both of your own keeping track of parts all in all, 15 testing products is actually proposed to have hydrological observance, even more 5 sampling points is actually recommended allow brand new tabs on new groundwater regimen. About MMMC urban area the hydrological gauging circumstances is actually chose in order to accommodate the water balance of your own lakes. This new collectors (K3 and you will K2) eating this new Ag gol and Sarisu lakes would be observed by Q1 and you will Q6. The latest outflows regarding the ponds will likely be observed from the Q4 and Q5. More inflows away from irrigation too-much liquid via P-step 1 and P-12-step one are going to be CES Asking Designers Sakzgifter GmbH 3-twenty-four P:UAZER5AiJRURENWRRIGAT1 ULENAUAN20001EIAREPORTFINALDOC Environment Review and you can Keeping track of throughout the Venture Area of the fresh Samur Apsheron Canal plus the Chief Mill Mugan Collector Overseeing monitored from the Q7 and you may Q8 correspondingly.
The MMMC water outfalls is actually advised become tracked on Q9. Move pointers of a couple normal Kura gauges and you may in one normal Araz assess is highly recommended together with. Groundwater gauges try proposed to assess the efficiency of the the latest MMMC enthusiast. Three gauges are placed over the started to of new collector (GW3, GW4 and GW5) and one is close to the Karabakh Canal (GWl), a fifth one to (GW2) is amongst the Kl and you will K2 debt collectors. Throughout the SAC city two hydrological gauges are proposed to monitor the fresh new hydrological . Thus you to station are installed on brand new Shabranchay river in order to assess the inflows with the lake, an additional station will be hung within river to see or watch the latest fluctuation of its water level.
On the top portion seepage losses as well as over-supply of irrigation h2o might possibly be smaller, having a feeling into the city: less water table, faster flat liquid ponds and you can a lower life expectancy danger of salinity
The fresh new hydrological findings is planned to become come after the fresh implementation of the brand new gauging stations, they must continue for at least five years adopting the framework could have been completed. New evaluating station are set up for the very first keeping track of venture. The fresh overseeing plan is in depth into the Desk 3. It is proposed to occupy one to hydrologist to possess forty five days to have the co-ordination additionally the testing of the findings. The fresh hydrologist would-be billed in order to run the site selections of the latest hydrometric and groundwater gauges while in the cuatro months within initiation of the overseeing plan. Simultaneously he will manage 2 job vacation (4 weeks as a whole) each year so you can all of the keeping track of components to deal with the newest industry observations. For most lake gpaign) a cable-car will likely be provided to allow it to be suspension measurements all over new canals/streams (4 altogether, except new sampling activities about lake urban area) and you can an excellent topographic area (15 overall) is place-up.
Environmental Analysis dos
year MMMC Ag gol, Q1, Q3 K2 Collector, Q2 Water level Daily 365 K3 Enthusiast Q4 Sarisu Q5, Q6 _ K2 Enthusiast, Q2 Once a month and in case Ag gol, Q3 . water top reached to help you 15 CES Asking Designers Salzgitter dating beetalk GmbH 3-twenty five P:bAZERgALIURURENVURRIGATI12LENAUAN21000EIAREPORTFINALDOC Environment Review and you will Monitoring from the Project Area of the Samur Apsheron Canal as well as the Main Factory Mugan Enthusiast Overseeing K3 Enthusiast Q4 Flow (water-level) restriction Sarisu Q5 P-step one, Q7 P-step one2-step 1, Q8 MMMC ocean outfall Q9 Kura, a couple gauges Araz, you to evaluate Near to K2 enthusiast, GWI Next to K2/KI collector GW2, Next to Groundwater dining table Immediately following all ten months thirty six the brand new enthusiast GW3, GW4 and GW5 SAC, Q5 Deveci Lake, Q4, Q5 water level Two times a day 365 Near Deveci River Groundwater table Shortly after ten days 0 CES Asking Designers Salzgitter GmbH step 3-twenty-six P:UAZERBALFlRURENVWRRIGAT1ULENAUAN20001EIAREPORTFINALDOC Ecological Evaluation and you will Monitoring regarding the Opportunity An element of the Samur Apsheron Tunnel therefore the Fundamental Mill Mugan Enthusiast MOt4TORING -v . ,; , :; .
The result to possess Sarisu River is actually a reduced total of inflowing liquid. Given that river is really low, and that is probably located above the groundwater level (as a result of the proximity of Kura River), there can be a threat that the inflow on the Ag-Gol river is shortage of to keep up the water balance. There aren’t any info of inflows and outflows in order to Sarisu Lake, and this chance can’t be got rid of. A supplementary perception ‘s the switching of about twenty five m3/s water drainage drinking water regarding the left-bank outfall toward Caspian Water toward a lot more southern right-bank outfall. This is not considered an important facet, however, monitoring of the brand new outfall area will be provided (send below). SAMUR APSHERON Canal The Samur Apsheron Tunnel (SAC) has got the dual purpose of alert of liquids throughout the Samur Lake so you can subscribe the needs of Baku City and also the Apsheron Peninsular also meeting the latest irrigation requirements from 95,100 ha.
CES Asking Designers Salzgitter GmbH Bottom line – cuatro P:AAZERBALIRURENWRRJGAT112LENAUAN200CEIAAREPORTFINALDOC Environmental Investigations and Overseeing about Venture Area of the Samur Apsheron Tunnel and Head Mill Mugan Enthusiast Administrator Realization Process of program can get zero significant influence on the new Qusar State Safe Area, the new Yalama Liana Oak Tree and/or Deveci Lagune. The newest Deveci River is now positively influenced by irrigation, as the load however eating the river try redirected to own local minor irrigation unconnected to the SAC program. With increased administration, while the reduced amount of losses on the SAC, your panels may have a way to improve hydraulic techniques of river from the reduced total of the newest area’s dependence on the newest local load having irrigation.
The latest financing can cost you perform down in order to everything $US86,100 when the zero GIS classification will be implemented during the REMU. If so new annual costs carry out miss a bit so you’re able to throughout the $US25,100. These costs are tentatively as the chatted about into the customer. They are based on 1999 rates account and you can do neither believe real and you will rate contingencies, neither would they believe costs for intemational products and you can taxation/lifestyle. The price offers are considered insignificant versus full funds. In view of this new Agent advises a good GIS equipped REMU. This approach is always to assists a modern-day data handling and you can a powerful enviromnental monitoring. CES Asking Engineers Salzgitter GmbH SUMEIAREPORTFINALDOC Environmental Assessment and Keeping track of inside the the project An element of the Samur Apsheron Tunnel and Fundamental Factory Mugan Collector Table Regarding Content material Professional Realization Table Out-of Articles step one Inclusion step one-step one 2.
During the last area overall keeping track of funds need to the RIIDIA II Ecological Keeping track of Program (REMS) is actually put. They reveals the newest set-upwards can cost you and also the functional costs into the a yearly base. Brand new Annexes try organized depending on the main chapters of brand new report: Annex A corresponding to point 2. Ecological Evaluation Annex B add up to point step 3. Keeping track of Program The newest moments of your around three social visit group meetings try showed when you look at the Annex C CES Consulting Designers Salzgitter GmbH step 1-dos P:IAZERBALJ\RURENW RRIGAT112LENAUAN2OOOEIAREPORTFINALDOC Ecological Assessment and Monitoring from the Project Section of the new Samur Apsheron Canal as well as the Head Factory Mugan Collector Assessment 2. An over-all evaluation of your establish environmental condition is completed when you look at the another paragraphs, such in addition to gauge the requested aftereffects of your panels into the environment.
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.